Addition of 8 floors above the 4 existing levels, new biotechnology and analysis labs and clinical facilities. Fast track construction mode inside a building in operation. Plumbing, heating and chilled water systems.
Addition of 8 floors above the 4 existing levels, new biotechnology and analysis labs and clinical facilities. Fast track construction mode inside a building in operation. Plumbing, heating and chilled water systems.