Development of the Senegal river

Manantalie Energy board (SOGEM), Mauritanie High voltage transmission line

Manantalie Energy board (SOGEM), Mauritanie High voltage transmission line

  • LocationRosso-Nouakchott, Mauritanie, Afrique
  • Contract
    Value
    18 000 000 $ CA
  • Duration10 months
  • End of the workApril 2002

Development of the Senegal river

Description

Desing, engineering, airborne topography, land survey, supply, fabrication, transportation and installation of 191 kilometers of high voltage electric line (225,000 volts) with optical fiber ground wire.